Main entrance to VUSN during construction

vusn construction

As of July 5, all visitors to the School of Nursing should enter from 21st Ave. S. via the MRB III ramp and new walkway into Godchaux Hall. Entry is also available from MRB III to the Nursing Annex between the hours of 7 a.m. and 4 p.m. All other entrances to the School of Nursing require VUSN ID cards.

The VUSN reception desk has been relocated to the Godchaux lobby. This is the main entrance to the School of Nursing for the duration of the new building construction.

  • The Godchaux entrance will be accessible throughout the project.
  • The Annex entrance will remain accessible throughout the project.
  • The Frist Hall 2nd floor back entrance will remain accessible throughout the project. VUSN faculty, staff and students will need to swipe their Vanderbilt ID badges to enter the building from this entrance.

The back door of Godchaux will remain accessible throughout the project. VUSN faculty, staff and students will need to swipe their Vanderbilt ID badges to enter the building from this entrance.

CONNECT WITH #VUSN